Technical Capability
Project Start
2022-2023
Completed the development of the 6-inch geometry inspection unit and AGM positioning receiver system
Road Map
2026-2027
Will conduct inspection tests on 8-inch pipelines, complete three pipeline inspections, and produce essential spare components
MFL & Cliper tool develope
2023-2024
Successfully developed a prototype of the 6-inch in-line inspection device
First inspection
2024-2025
Will conduct inspection test on 6-inch pipelines and complete three pipeline inspections
Technology we have
2025-2026
Will complete prototype development of the 8-inch in-line inspection device
Project Goals &
Current Execution Progress
0
Execution progress
Developed and manufactured one set each of 6-inch and 8-inch underground pipeline geometry inspection PIGs (Geometry Detection PIG).
May 1, 2025
0
Execution progress
Developed and manufactured one set each of 6-inch and 8-inch smart magnetic flux leakage inspection PIGs for corrosion and defect detection, along with the establishment of corresponding inspection technologies.
May 1, 2025
0
Execution progress
Developed a 3D tracking system integrating a 3-D gyroscope and Global Positioning System (GPS) for precise pipeline positioning.
May 1, 2025
0
Execution progress
Completed three inspection tests and data analysis reports for both 6-inch and 8-inch underground pipelines.
May 1, 2025
Cooperation Units